Primary Bathroom (Midland)

The goal here was to redesign the primary bathroom to have a more open shower and more counter space and storage. Also, the toilet was facing the wrong way. The current bathtub and toilet are under a pitched ceiling line, which made layout options limited.

Previous
Previous

Primary Closets (Park)

Next
Next

Kitchen (Carteret)